TRIUMF Grid System Management Documentation

TRIUMF Site Description

The prototype TRIUMF LCG Site was installed and configured in the summer of 2004.  The site consists of 2 compute elements, 2 storage elements, a UI, a Mon node and 9 worker nodes.

  • Compute Elements
  • Storage Elements
  • Worker Nodes
  • User Interface
  • GIIS/Monitoring
  • Other
to do: brief description of configuration and hardware of each of the above ...

Hardware Notes

Notes and documentation specific to some hardware are available under the Hardware Notes link in the menu.